Rooftop solar array on a Utah home
← All Services
Service 01

Solar & Battery Backup

Rooftop PV, battery storage, and standby generators — engineered, permitted, and installed by a licensed master electrician.

Two Tracks

Choose your path — most homes combine both.

Ground-mounted solar array in rural Utah
Rooftop solar array on a modern Utah home
Track A
Rooftop PV
Ground-Mount Array

Solar

Rooftop PV designed for Utah sun, snow, and net-metering rules.

  • Engineered PV layout, stamped by a licensed engineer
  • Tier-1 modules
  • Microinverters or string inverter platform
  • Rocky Mountain Power net-metering interconnection filed for you
  • Roof or ground-mount racking sized for Utah wind & snow loads
  • Production monitoring included
Estimate Solar
Whole-home standby generator on a concrete pad
Tesla Powerwall mounted on garage exterior
Track B
Tesla Powerwall
Standby Generator

Backup Options

Battery storage and standby generators sized to your critical loads.

  • Battery storage systems
  • Generac standby generators from 10kW to 26kW
  • Automatic transfer switch (ATS) with critical-loads panel
  • NEC 705 / 702 compliant interconnection drawings
  • Natural gas or propane fuel; concrete pad + code clearances
  • Annual maintenance and remote monitoring available
Estimate Backup Options
Our Process

From first walkthrough to final inspection.

Every project is run by a licensed master electrician — no rotating subs.

  1. 01

    Site Assessment

    On-site evaluation of roof structure, shading, azimuth, and main service capacity. We pull historical usage from your utility to size the array against real load — not a stock quote.

  2. 02

    Engineered Design

    PV layout, string sizing, conduit routing, and load calculations stamped by a licensed engineer. Battery and generator interconnection drawn against NEC 705 and 702.

  3. 03

    Permitting & Utility

    We file with your AHJ (Salt Lake County, Davis, Weber, Summit, Cache) and submit the Rocky Mountain Power net-metering interconnection on your behalf.

  4. 04

    Installation

    Roof penetrations flashed and sealed, rails torqued to spec, conduit run cleanly along architectural lines. Battery and ATS hardware mounted in a dedicated, code-clearance bay.

  5. 05

    Inspection & Commissioning

    We meet the city inspector on-site, walk the system end-to-end, and verify production, monitoring, and backup transfer before we hand you the keys.

Next Step

Ready for a real estimate? Let's walk your site.

Most projects start with a 30-minute on-site assessment. No high-pressure pitch — just an honest scope.